BQ76930EVM

Mfr. #: BQ76930EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR BQ76930
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: BQ76930EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ76930EVM Overview

Product belongs to the BQ76930 series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed EV2300 EV2400 amplifier. The Power Management, Battery Monitor is the Main-Purpose. Primary-Attributes: - IC package type: BQ76930 Maximum operating temperature of + 30 C Minimum operating temperature: + 20 C Output voltage: 2.5 V This tool is designed for the BQ76930. USB interface type Input Voltage Range: 26 V to 44 V Output current: 15 A

BQ76930EVM Image

BQ76930EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76930EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series BQ76930
  • Product Evaluation Modules
  • Type Battery Management
  • For-Use-With EV2300 EV2400
  • Main-Purpose Power Management, Battery Monitor
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ76930
  • Maximum-Operating-Temperature + 30 C
  • Minimum-Operating-Temperature + 20 C
  • Output-Voltage 2.5 V
  • Tool-Is-For-Evaluation-Of BQ76930
  • Interface-Type USB
  • Input-Voltage 26 V to 44 V
  • Output-Current 15 A

BQ76930EVM

BQ76930EVM Specifications

BQ76930EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed BQ76930

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed EV2300 EV2400

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Battery Monitor.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed BQ76930

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 30 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is + 20 C.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 2.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is BQ76930.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 26 V to 44 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 15 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
373,50 US$
373,50 US$
10
354,82 US$
3 548,25 US$
100
336,15 US$
33 615,00 US$
500
317,48 US$
158 737,50 US$
1000
298,80 US$
298 800,00 US$
Top