BQ27531EVM

Mfr. #: BQ27531EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR BQ27531
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: BQ27531EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27531EVM Overview

Product belongs to the Impedance Track series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed bq24192 amplifier. The Power Management, Fuel Gauge is the Main-Purpose. Primary-Attributes: - IC package type: BQ27531 This product is an Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell. This tool is designed for the BQ24192. I2C USB interface type Input Voltage Range: 4.2 V to 10 V

BQ27531EVM Image

BQ27531EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27531EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series Impedance Track
  • Product Evaluation Modules
  • Type Battery Management
  • For-Use-With bq24192
  • Main-Purpose Power Management, Fuel Gauge
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ27531
  • Description-Function Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell
  • Tool-Is-For-Evaluation-Of BQ24192
  • Interface-Type I2C USB
  • Input-Voltage 4.2 V to 10 V

BQ27531EVM

BQ27531EVM Specifications

BQ27531EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is Impedance Track.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is bq24192.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Fuel Gauge

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ27531.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is BQ24192.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 4.2 V to 10 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
148,50 US$
148,50 US$
10
141,08 US$
1 410,75 US$
100
133,65 US$
13 365,00 US$
500
126,22 US$
63 112,50 US$
1000
118,80 US$
118 800,00 US$
Top