BQ2000EVM

Mfr. #: BQ2000EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR BQ2000
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: BQ2000EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ2000EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Battery Management The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: 1 ~ 4 Cell- Li-Ion, 1 ~ 10 Cell- NiCd/NiMH IC package type: BQ2000 This tool is designed for the BQ2000 BQ2000T. Our product measures 70 mm x 45.7 mm in dimensions for compact and convenient use. Input Voltage Range: 10 V to 25 V

BQ2000EVM Image

BQ2000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ2000EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Battery Management
  • Main-Purpose Power Management, Battery Charger
  • Primary-Attributes 1 ~ 4 Cell- Li-Ion, 1 ~ 10 Cell- NiCd/NiMH
  • Embedded No
  • Utilized-IC-Part BQ2000
  • Tool-Is-For-Evaluation-Of BQ2000 BQ2000T
  • Dimensions 70 mm x 45.7 mm
  • Input-Voltage 10 V to 25 V

BQ2000EVM

BQ2000EVM Specifications

BQ2000EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Battery Charger.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 1 ~ 4 Cell- Li-Ion, 1 ~ 10 Cell- NiCd/NiMH.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ2000.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ2000 BQ2000T

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 70 mm x 45.7 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 10 V to 25 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
56,74 US$
56,74 US$
10
53,91 US$
539,08 US$
100
51,07 US$
5 107,05 US$
500
48,23 US$
24 116,65 US$
1000
45,40 US$
45 396,00 US$
Top