AFEDRI8201EVM

Mfr. #: AFEDRI8201EVM
Fabricante: Texas Instruments
Descripción: MODULE EVAL FOR AFEDRI8201
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AFEDRI8201EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFEDRI8201EVM Overview

Compatible with AFEDRI8201. Product belongs to the - series. Type: Front End This product's - range is 0Hz to 2.2GHz. Included item: Board, Cable, Power Supply.

AFEDRI8201EVM Image

AFEDRI8201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFEDRI8201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products AFEDRI8201
  • Series -
  • Type Front End
  • Frequency -
  • Supplied-Contents Board, Cable, Power Supply

AFEDRI8201EVM

AFEDRI8201EVM Specifications

AFEDRI8201EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is AFEDRI8201.

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Type of the product?

    Q: The Type of the product is Front End.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cable, Power Supply.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
0,00 US$
0,00 US$
10
0,00 US$
0,00 US$
100
0,00 US$
0,00 US$
500
0,00 US$
0,00 US$
1000
0,00 US$
0,00 US$
Top