AFE5851EVM

Mfr. #: AFE5851EVM
Fabricante: Texas Instruments
Descripción: EVAL BOARD FOR AFE5851
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AFE5851EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5851EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS IC package type: AFE5851 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the AFE5851. SMA USB interface type

AFE5851EVM Image

AFE5851EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5851EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS
  • Embedded No
  • Utilized-IC-Part AFE5851
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of AFE5851
  • Interface-Type SMA USB

AFE5851EVM

AFE5851EVM Specifications

AFE5851EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5851.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AFE5851

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
346,20 US$
346,20 US$
10
328,89 US$
3 288,90 US$
100
311,58 US$
31 158,00 US$
500
294,27 US$
147 135,00 US$
1000
276,96 US$
276 960,00 US$
Top