AFE5804EVM

Mfr. #: AFE5804EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR AFE5804
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AFE5804EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5804EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5804 This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the AFE5804. RS-232 SMA interface type

AFE5804EVM Image

AFE5804EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5804EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5804
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of AFE5804
  • Interface-Type RS-232 SMA

AFE5804EVM

AFE5804EVM Specifications

AFE5804EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 8 Channel LVDS Outputs.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AFE5804

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is AFE5804.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is RS-232 SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
38,25 US$
38,25 US$
10
36,34 US$
363,38 US$
100
34,42 US$
3 442,50 US$
500
32,51 US$
16 256,25 US$
1000
30,60 US$
30 600,00 US$
Top