AFE5803EVM

Mfr. #: AFE5803EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR AFE5803
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AFE5803EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5803EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5803 Maximum operating temperature of + 70 C SPI interface type

AFE5803EVM Image

AFE5803EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5803EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5803
  • Maximum-Operating-Temperature + 70 C
  • Interface-Type SPI

AFE5803EVM

AFE5803EVM Specifications

AFE5803EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 8 Channel LVDS Outputs

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AFE5803

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 70 C.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
57,46 US$
57,46 US$
10
54,59 US$
545,92 US$
100
51,72 US$
5 171,85 US$
500
48,85 US$
24 422,65 US$
1000
45,97 US$
45 972,00 US$
Top