ADS8412EVM

Mfr. #: ADS8412EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE FOR ADS8412
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS8412EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8412EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 2M. Data-Interface: Parallel 16 bits 1 units Input range: 0 ~ 4.096 V Included item: Board. IC package type: ADS8412 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8412. SMA interface type

ADS8412EVM Image

ADS8412EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8412EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 2M
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.096 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8412
  • Power-Typ-Conditions 175mW @ 2MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8412
  • Interface-Type SMA

ADS8412EVM

ADS8412EVM Specifications

ADS8412EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 2M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.096 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8412.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS8412.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
172,52 US$
172,52 US$
10
163,89 US$
1 638,89 US$
100
155,26 US$
15 526,35 US$
500
146,64 US$
73 318,90 US$
1000
138,01 US$
138 012,00 US$
Top