ADS8381EVM

Mfr. #: ADS8381EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE FOR ADS8381
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS8381EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8381EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 580k. Data-Interface: Parallel 18 bits 1 units Input range: 0 ~ 4.2 V Included item: Board. IC package type: ADS8381 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8381. SMA interface type

ADS8381EVM Image

ADS8381EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8381EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 580k
  • Data-Interface Parallel
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.2 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8381
  • Power-Typ-Conditions 115mW @ 580kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8381
  • Interface-Type SMA

ADS8381EVM

ADS8381EVM Specifications

ADS8381EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 580k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 18.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.2 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8381.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8381.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
114,63 US$
114,63 US$
10
108,90 US$
1 088,98 US$
100
103,17 US$
10 316,70 US$
500
97,44 US$
48 717,75 US$
1000
91,70 US$
91 704,00 US$
Top