ADS8380EVM

Mfr. #: ADS8380EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE FOR ADS8380
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS8380EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8380EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 600k. Data-Interface: Serial 18 bits 1 units Input range: 0 ~ 4.2 V Included item: Board. IC package type: ADS8380 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8380. SMA interface type

ADS8380EVM Image

ADS8380EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8380EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 600k
  • Data-Interface Serial
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.2 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8380
  • Power-Typ-Conditions 115mW @ 600kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8380
  • Interface-Type SMA

ADS8380EVM

ADS8380EVM Specifications

ADS8380EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 600k

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 18

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.2 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8380.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8380

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
111,26 US$
111,26 US$
10
105,69 US$
1 056,92 US$
100
100,13 US$
10 012,95 US$
500
94,57 US$
47 283,40 US$
1000
89,00 US$
89 004,00 US$
Top