ADS8365M-EVM

Mfr. #: ADS8365M-EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR ADS8365
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS8365M-EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8365M-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 250k. Data-Interface: Parallel 16 bits 6 units Input range: ±VREF Included item: Board. IC package type: ADS8365 This product operates at a 4.75 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS8365.

ADS8365M-EVM Image

ADS8365M-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8365M-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 250k
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 6
  • Input-Range ±VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8365
  • Power-Typ-Conditions 200mW @ 250kSPS
  • Operating-Supply-Voltage 4.75 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS8365

ADS8365M-EVM

ADS8365M-EVM Specifications

ADS8365M-EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250k

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 6.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed ±VREF

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8365

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 4.75 V to 5.25 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8365.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
114,63 US$
114,63 US$
10
108,90 US$
1 088,98 US$
100
103,17 US$
10 316,70 US$
500
97,44 US$
48 717,75 US$
1000
91,70 US$
91 704,00 US$
Top