| Mfr. #: | ADS7866EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | MODULE EVAL FOR ADS7866 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | ADS7866EVM Ficha de datos |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 200k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ 3.6 V Included item: Board. IC package type: ADS7866 This product operates at a 1.2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7866.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7866EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 200k.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Serial
A: Is the cutoff frequency of the product Number-of-Bits?
Q: Yes, the product's Number-of-Bits is indeed 12
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed 0 ~ 3.6 V
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS7866.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 1.2 V to 3.6 V
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS7866.