ADS7863EVM

Mfr. #: ADS7863EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR ADS7863
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS7863EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7863EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 2M. Data-Interface: Serial 12 bits 2 units Input range: ±VREF Included item: Board. IC package type: ADS7863 This product operates at a 2.7 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7863. USB interface type

ADS7863EVM Image

ADS7863EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7863EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 2M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range ±VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7863
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2.7 V to 3.6 V
  • Tool-Is-For-Evaluation-Of ADS7863
  • Interface-Type USB

ADS7863EVM

ADS7863EVM Specifications

ADS7863EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 2M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is ±VREF.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7863.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 3.6 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7863

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
86,85 US$
86,85 US$
10
82,51 US$
825,08 US$
100
78,16 US$
7 816,50 US$
500
73,82 US$
36 911,25 US$
1000
69,48 US$
69 480,00 US$
Top