ADS7041EVM-PDK

Mfr. #: ADS7041EVM-PDK
Fabricante: Texas Instruments
Descripción: EVAL BOARD FOR ADS7041
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS7041EVM-PDK Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7041EVM-PDK Overview

Product belongs to the - series. This product is categorized as Demonstration Kits Type: ADC This product is designed ADS7041 amplifier. This product's 1M. Data-Interface: SPI 10 bits 1 units Input range: - Included item: 2 Boards, Cable. IC package type: ADS7041 This product operates at a 1.8 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7041. SPI interface type

ADS7041EVM-PDK Image

ADS7041EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7041EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Demonstration Kits
  • Type ADC
  • For-Use-With ADS7041
  • Sampling-Rate-Per-Second 1M
  • Data-Interface SPI
  • Number-of-Bits 10
  • Number-of-A-D-Converters 1
  • Input-Range -
  • Supplied-Contents 2 Boards, Cable
  • Utilized-IC-Part ADS7041
  • Power-Typ-Conditions 0.189mW @ 1MSPS
  • Operating-Supply-Voltage 1.8 V to 3.6 V
  • Tool-Is-For-Evaluation-Of ADS7041
  • Interface-Type SPI

ADS7041EVM-PDK

ADS7041EVM-PDK Specifications

ADS7041EVM-PDK FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Kits.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS7041.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 1M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 10.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cable.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7041.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 3.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7041.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
230,43 US$
230,43 US$
10
218,91 US$
2 189,08 US$
100
207,39 US$
20 738,70 US$
500
195,87 US$
97 932,75 US$
1000
184,34 US$
184 344,00 US$
Top