ADS6442EVM

Mfr. #: ADS6442EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR ADS6442
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS6442EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6442EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial, Parallel 14 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS6442 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6442. SMA interface type

ADS6442EVM Image

ADS6442EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6442EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6442
  • Power-Typ-Conditions 265mW @ 65MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6442
  • Interface-Type SMA

ADS6442EVM

ADS6442EVM Specifications

ADS6442EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 65M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS6442

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS6442.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
346,20 US$
346,20 US$
10
328,89 US$
3 288,90 US$
100
311,58 US$
31 158,00 US$
500
294,27 US$
147 135,00 US$
1000
276,96 US$
276 960,00 US$
Top