ADS6245EVM

Mfr. #: ADS6245EVM
Fabricante: Texas Instruments
Descripción: ADS6245EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS6245EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6245EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 125M. Data-Interface: Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6245 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6245. SMA interface type

ADS6245EVM Image

ADS6245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6245EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 125M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6245
  • Power-Typ-Conditions 500mW @ 125MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6245
  • Interface-Type SMA

ADS6245EVM

ADS6245EVM Specifications

ADS6245EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 125M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS6245.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS6245

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
336,02 US$
336,02 US$
10
319,21 US$
3 192,14 US$
100
302,41 US$
30 241,35 US$
500
285,61 US$
142 806,40 US$
1000
268,81 US$
268 812,00 US$
Top