ADS5463EVM

Mfr. #: ADS5463EVM
Fabricante: Texas Instruments
Descripción: BOARD EVAL FOR ADS5463
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS5463EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5463EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 500M. Data-Interface: LVDS - Parallel 12 bits 1 units Input range: 2.2 Vpp Included item: Board. IC package type: ADS5463 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5463. SMA interface type

ADS5463EVM Image

ADS5463EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5463EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category IC Chips
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 500M
  • Data-Interface LVDS - Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2.2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5463
  • Power-Typ-Conditions 2.2W @ 500MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5463
  • Interface-Type SMA

ADS5463EVM

ADS5463EVM Specifications

ADS5463EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 500M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Parallel

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2.2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5463.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5463.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
346,20 US$
346,20 US$
10
328,89 US$
3 288,90 US$
100
311,58 US$
31 158,00 US$
500
294,27 US$
147 135,00 US$
1000
276,96 US$
276 960,00 US$
Top