| Mfr. #: | ADS5404EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | ADS5404EVM EVALUATION MODULE |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | ADS5404EVM Ficha de datos |


Product belongs to the ADS5404 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x ADS54T0x amplifier. This product's 500M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5404 This product operates at a 5 V supply voltage for reliable performance. This product is an Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS. This tool is designed for the ADS540x ADS54T0x. SPI USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5404EVM Specifications
A: At what frequency does the Series?
Q: The product Series is ADS5404.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: Is the cutoff frequency of the product For-Use-With?
Q: Yes, the product's For-Use-With is indeed ADS540x ADS54T0x
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 500M.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed DDR LVDS
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 2.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 1 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS5404.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 5 V.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS540x ADS54T0x.
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is SPI USB.