ADS42B49EVM

Mfr. #: ADS42B49EVM
Fabricante: Texas Instruments
Descripción: MODULE EVAL FOR ADS42B49
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS42B49EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42B49EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS42B49 amplifier. This product's 250M. Data-Interface: LVDS - Parallel, Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS42B49 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS42B49EVM evaluation module. This tool is designed for the ADS42B49. 330 mA is 92 nA. Parallel Serial interface type

ADS42B49EVM Image

ADS42B49EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42B49EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS42B49
  • Sampling-Rate-Per-Second 250M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS42B49
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS42B49EVM evaluation module
  • Tool-Is-For-Evaluation-Of ADS42B49
  • Operating-Supply-Current 330 mA
  • Interface-Type Parallel Serial

ADS42B49EVM

ADS42B49EVM Specifications

ADS42B49EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS42B49.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Parallel, Serial

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS42B49.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed ADS42B49EVM evaluation module

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS42B49.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 330 mA.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Parallel Serial.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
448,50 US$
448,50 US$
10
426,08 US$
4 260,75 US$
100
403,65 US$
40 365,00 US$
500
381,22 US$
190 612,50 US$
1000
358,80 US$
358 800,00 US$
Top