ADS4226EVM

Mfr. #: ADS4226EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR ADS4226
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS4226EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4226EVM Overview

Product belongs to the - series. This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4226

ADS4226EVM Image

ADS4226EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4226EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 160M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4226
  • Power-Typ-Conditions -

ADS4226EVM

ADS4226EVM Specifications

ADS4226EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 160M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4226.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
346,20 US$
346,20 US$
10
328,89 US$
3 288,90 US$
100
311,58 US$
31 158,00 US$
500
294,27 US$
147 135,00 US$
1000
276,96 US$
276 960,00 US$
Top