ADS41B25EVM

Mfr. #: ADS41B25EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR ADS41B25
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS41B25EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS41B25EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 125M. Data-Interface: CMOS, LVDS, Serial, Parallel 12 bits 1 units Input range: 1.5 Vpp Included item: Board. IC package type: ADS41B25 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the ADS41B25. SPI interface type

ADS41B25EVM Image

ADS41B25EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS41B25EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 125M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 1.5 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS41B25
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of ADS41B25
  • Interface-Type SPI

ADS41B25EVM

ADS41B25EVM Specifications

ADS41B25EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 125M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 1.5 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS41B25.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS41B25.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
57,46 US$
57,46 US$
10
54,59 US$
545,92 US$
100
51,72 US$
5 171,85 US$
500
48,85 US$
24 422,65 US$
1000
45,97 US$
45 972,00 US$
Top