ADS1278EVM-PDK

Mfr. #: ADS1278EVM-PDK
Fabricante: Texas Instruments
Descripción: KIT EVAL/DEMO FOR ADS1278
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS1278EVM-PDK Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1278EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 128k. Data-Interface: SPI 24 bits 8 units Input range: ±2.5 V Included item: 2 Boards. IC package type: ADS1278 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS1278. USB interface type

ADS1278EVM-PDK Image

ADS1278EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1278EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 128k
  • Data-Interface SPI
  • Number-of-Bits 24
  • Number-of-A-D-Converters 8
  • Input-Range ±2.5 V
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS1278
  • Power-Typ-Conditions 31mW @ 52kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS1278
  • Interface-Type USB

ADS1278EVM-PDK

ADS1278EVM-PDK Specifications

ADS1278EVM-PDK FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 128k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 24.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 8

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±2.5 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS1278.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS1278

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
223,50 US$
223,50 US$
10
212,32 US$
2 123,25 US$
100
201,15 US$
20 115,00 US$
500
189,98 US$
94 987,50 US$
1000
178,80 US$
178 800,00 US$
Top