ADC3441EVM

Mfr. #: ADC3441EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE ADC3441
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADC3441EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3441EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 25M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3441 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3441 14 bit 4 channel 25 Msps analog to digital converter. This tool is designed for the ADC3441. Serial LVDS interface type

ADC3441EVM Image

ADC3441EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3441EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 25M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3441
  • Power-Typ-Conditions 177mW @ 25MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3441 14 bit 4 channel 25 Msps analog to digital converter
  • Tool-Is-For-Evaluation-Of ADC3441
  • Interface-Type Serial LVDS

ADC3441EVM

ADC3441EVM Specifications

ADC3441EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 25M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 4

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADC3441.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is ADC3441 14 bit 4 channel 25 Msps analog to digital converter.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADC3441.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Serial LVDS.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
454,51 US$
454,51 US$
10
431,78 US$
4 317,80 US$
100
409,06 US$
40 905,51 US$
500
386,33 US$
193 164,90 US$
1000
363,60 US$
363 604,60 US$
Top