ADC32J22EVM

Mfr. #: ADC32J22EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE ADC32J22
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADC32J22EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC32J22EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product This product's 50M. Data-Interface: JESD204B Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC32J22

ADC32J22EVM Image

ADC32J22EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC32J22EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Bulk
  • Sampling-Rate-Per-Second 50M
  • Data-Interface JESD204B Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC32J22
  • Power-Typ-Conditions 281mW @ 50MSPS

ADC32J22EVM

ADC32J22EVM Specifications

ADC32J22EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 50M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is JESD204B Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC32J22.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
448,50 US$
448,50 US$
10
426,08 US$
4 260,75 US$
100
403,65 US$
40 365,00 US$
500
381,22 US$
190 612,50 US$
1000
358,80 US$
358 800,00 US$
Top