ADC3244EVM

Mfr. #: ADC3244EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR ADC3244
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADC3244EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3244EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADC3244 amplifier. This product's 125M. Data-Interface: LVDS - Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC3244 This product operates at a 1.8 V supply voltage for reliable performance. This tool is designed for the ADC3244. Serial interface type

ADC3244EVM Image

ADC3244EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3244EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADC3244
  • Sampling-Rate-Per-Second 125M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3244
  • Power-Typ-Conditions 233mW @ 125MSPS
  • Operating-Supply-Voltage 1.8 V
  • Tool-Is-For-Evaluation-Of ADC3244
  • Interface-Type Serial

ADC3244EVM

ADC3244EVM Specifications

ADC3244EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADC3244.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 125M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC3244.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC3244

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Serial.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
448,50 US$
448,50 US$
10
426,08 US$
4 260,75 US$
100
403,65 US$
40 365,00 US$
500
381,22 US$
190 612,50 US$
1000
358,80 US$
358 800,00 US$
Top