Product Details
ADC3243EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC3243 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3243 evaluation module. This tool is designed for the ADC3243. Serial LVDS interface type

ADC3243EVM Image

ADC3243EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3243EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 80M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3243
  • Power-Typ-Conditions 183mW @ 80MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3243 evaluation module
  • Tool-Is-For-Evaluation-Of ADC3243
  • Interface-Type Serial LVDS

ADC3243EVM

ADC3243EVM Specifications

ADC3243EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 80M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADC3243.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed ADC3243 evaluation module

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC3243

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Serial LVDS

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
448,50 US$
448,50 US$
10
426,08 US$
4 260,75 US$
100
403,65 US$
40 365,00 US$
500
381,22 US$
190 612,50 US$
1000
358,80 US$
358 800,00 US$