XTR108EVM-USB

Mfr. #: XTR108EVM-USB
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools XTR108 Eval Module USB Version
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: XTR108EVM-USB Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
XTR108EVM-USB Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage to Current Converters type. 12 V to 24 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.645523 oz of Unit Weight

XTR108EVM-USB Image

XTR108EVM-USB

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

XTR108EVM-USB Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Voltage to Current Converters
  • Tool Is For Evaluation Of: XTR108
  • Operating Supply Voltage: 12 V to 24 V
  • Series: XTR108
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.645523 oz

XTR108EVM-USB

XTR108EVM-USB Specifications

XTR108EVM-USB FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage to Current Converters.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 12 V to 24 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.645523 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top