UCD3138OL64EVM-031

Mfr. #: UCD3138OL64EVM-031
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools UCD3138OL64 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: UCD3138OL64EVM-031 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCD3138OL64EVM-031 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 3.3 V, 5 V Input Voltage Dimensions of 6 in x 4 in x 0.5 in Texas Instruments is a trusted brand for quality electronics Interface Type: JTAG, PMBus, UART Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.492181 oz of Unit Weight

UCD3138OL64EVM-031 Image

UCD3138OL64EVM-031

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCD3138OL64EVM-031 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: UCD3138
  • Input Voltage: 3.3 V, 5 V
  • Description/Function: UCD3138 programmable digital power controller open loop evaluation module (64-pin version)
  • Dimensions: 6 in x 4 in x 0.5 in
  • Series: UCD3138
  • Brand: Texas Instruments
  • Interface Type: JTAG, PMBus, UART
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.492181 oz

UCD3138OL64EVM-031

UCD3138OL64EVM-031 Specifications

UCD3138OL64EVM-031 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Power Management Specialized.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.3 V, 5 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 6 in x 4 in x 0.5 in.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed JTAG, PMBus, UART

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.492181 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top