UCC28521EVM

Mfr. #: UCC28521EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools UCC28521 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: UCC28521EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC28521EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Factor Correction type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UCC28521EVM Image

UCC28521EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28521EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Power Factor Correction
  • Tool Is For Evaluation Of: UCC28521
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC28521EVM

UCC28521EVM Specifications

UCC28521EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Power Factor Correction.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top