| Mfr. #: | UCC28061EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools UCC28061EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | UCC28061EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Factor Correction type. 85 V to 265 V Input Voltage Output Voltage is 390 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28061EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Power Factor Correction.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 85 V to 265 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 390 V.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.