TXS0202EVM

Mfr. #: TXS0202EVM
Fabricante: Texas Instruments
Descripción: Other Development Tools TXS0202EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TXS0202EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TXS0202EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Level Translator type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB 1.65 V to 3.6 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.020890 oz of Unit Weight

TXS0202EVM Image

TXS0202EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TXS0202EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Voltage Level Translator
  • Tool Is For Evaluation Of: TXS0202
  • Series: TXS0202
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 1.65 V to 3.6 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.020890 oz

TXS0202EVM

TXS0202EVM Specifications

TXS0202EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Level Translator

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.65 V to 3.6 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Other Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.020890 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top