| Mfr. #: | TSW3065EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Clock & Timer Development Tools TSW3065EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TSW3065EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Synthesizers type. Frequency range: 300 MHz to 4.8 GHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V/6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3065EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Clock Synthesizers.
A: What is the Frequency of the product?
Q: The Frequency of the product is 300 MHz to 4.8 GHz.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 5 V/6 V.
A: At what frequency does the Product Type?
Q: The product Product Type is Clock & Timer Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.