TSW16DX370EVM

Mfr. #: TSW16DX370EVM
Fabricante: Texas Instruments
Descripción: RF Development Tools TSW16DX370EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TSW16DX370EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW16DX370EVM Overview

This product is manufactured by Texas Instruments. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TSW16DX370EVM Image

TSW16DX370EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW16DX370EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • Shipping Restrictions:
  • RoHS: Y
  • Packaging: Bulk
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW16DX370EVM

TSW16DX370EVM Specifications

TSW16DX370EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is RF Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top