TSW14DL3200EVM

Mfr. #: TSW14DL3200EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools TSW14DL3200 EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TSW14DL3200EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW14DL3200EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC and DAC type. 10 V to 14 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW14DL3200EVM Image

TSW14DL3200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW14DL3200EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC and DAC
  • Tool Is For Evaluation Of: TSW14DL3200
  • Operating Supply Voltage: 10 V to 14 V
  • Description/Function: High-speed data LVDS capture and pattern generator card
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 3 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW14DL3200EVM

TSW14DL3200EVM Specifications

TSW14DL3200EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC and DAC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 10 V to 14 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top