TSC2020EVM

Mfr. #: TSC2020EVM
Fabricante: Texas Instruments
Descripción: Display Development Tools TSC2020 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TSC2020EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2020EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards 1.6 V to 3.6 V operating supply voltage range Interface Type: I2C, USB Texas Instruments is a trusted brand for quality electronics Compatible with USB-MODEVM. Display Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.205 lbs of Unit Weight

TSC2020EVM Image

TSC2020EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2020EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Tool Is For Evaluation Of: TSC2020
  • Operating Supply Voltage: 1.6 V to 3.6 V
  • Interface Type: I2C, USB
  • Brand: Texas Instruments
  • For Use With: USB-MODEVM
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.205 lbs

TSC2020EVM

TSC2020EVM Specifications

TSC2020EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.6 V to 3.6 V

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed USB-MODEVM

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Display Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 2.205 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top