TSC2005EVM

Mfr. #: TSC2005EVM
Fabricante: Texas Instruments
Descripción: Touch Sensor Development Tools TSC2005 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TSC2005EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2005EVM Overview

This product is manufactured by Texas Instruments. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TSC2005EVM Image

TSC2005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2005EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TSC2005
  • Operating Supply Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2005EVM

TSC2005EVM Specifications

TSC2005EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Touch Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top