| Mfr. #: | TRF37B32EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | RF Development Tools TRF37B32EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TRF37B32EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the RF Mixers type. Frequency range: 1.95 GHz 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with TRF37x32. RF Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37B32EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed RF Mixers
A: What is the Frequency of the product?
Q: The Frequency of the product is 1.95 GHz.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed TRF37x32
A: At what frequency does the Product Type?
Q: The product Product Type is RF Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.