| Mfr. #: | TRF3701EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | RF Development Tools TRF3701 Eval Mod |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TRF3701EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Modulators / Demodulators type. Frequency range: 400 MHz to 1.5 GHz 5 V operating supply voltage range Dimensions of 76 mm x 76 mm x 1.575 mm Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3701EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Modulators / Demodulators.
A: What is the Frequency of the product?
Q: The Frequency of the product is 400 MHz to 1.5 GHz.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 5 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 76 mm x 76 mm x 1.575 mm.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is RF Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.