TPS92690EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS92690. Output current: 500 mA Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 4.350 lbs of Unit Weight

TPS92690EVM Image

TPS92690EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS92690EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • For Use With: TPS92690
  • Series: TPS92690
  • Description/Function: Evaluates the operation and performance of the TPS92690 DC-DC N-channel MOSFET controller
  • Output Current: 500 mA
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 4.350 lbs

TPS92690EVM

TPS92690EVM Specifications

TPS92690EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS92690

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 500 mA

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed LED Lighting Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 4.350 lbs.