TPS7B6701EVM

Mfr. #: TPS7B6701EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS7B6701 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS7B6701EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B6701EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 4 V to 40 V Input Voltage Output Voltage is 1.5 to 18 V Output current: 450 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7B6701EVM Image

TPS7B6701EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6701EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B6701-Q1
  • Input Voltage: 4 V to 40 V
  • Output Voltage: 1.5 to 18 V
  • Description/Function: Evaluates the operation and performance of the TPS7B6701-Q1 linear regulator
  • Output Current: 450 mA
  • Series: TPS7B6701
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7B6701EVM

TPS7B6701EVM Specifications

TPS7B6701EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4 V to 40 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.5 to 18 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 450 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top