TPS7A91EVM-831

Mfr. #: TPS7A91EVM-831
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS7A91EVM-831
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS7A91EVM-831 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7A91EVM-831 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 6.5 V Input Voltage Output Voltage is 50 mV to 1.6 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.002038 oz of Unit Weight

TPS7A91EVM-831 Image

TPS7A91EVM-831

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7A91EVM-831 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7A9101DSK
  • Input Voltage: 6.5 V
  • Output Voltage: 50 mV to 1.6 V
  • Output Current: 1 A
  • Series: TPS7A91
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.002038 oz

TPS7A91EVM-831

TPS7A91EVM-831 Specifications

TPS7A91EVM-831 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 6.5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 50 mV to 1.6 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.002038 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top