TPS7A85EVM-754

Mfr. #: TPS7A85EVM-754
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS7A85EVM-754
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS7A85EVM-754 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7A85EVM-754 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 1.1 V to 6.5 V Input Voltage Output Voltage is 0.8 V to 5 V Output current: 4 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS7A85. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7A85EVM-754 Image

TPS7A85EVM-754

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7A85EVM-754 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7A85
  • Input Voltage: 1.1 V to 6.5 V
  • Output Voltage: 0.8 V to 5 V
  • Description/Function: Evaluation module as a reference design for engineering demonstration and evaluation of the TPS7A8500RGR
  • Output Current: 4 A
  • Series: TPS7A85
  • Brand: Texas Instruments
  • For Use With: TPS7A85
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7A85EVM-754

TPS7A85EVM-754 Specifications

TPS7A85EVM-754 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.1 V to 6.5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 0.8 V to 5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 4 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS7A85

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top