TPS70351EVM-165

Mfr. #: TPS70351EVM-165
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS70351-165 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS70351EVM-165 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS70351EVM-165 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 6 V Input Voltage Output Voltage is 3.3 V Dimensions of 88.6 mm x 74.7 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS70351EVM-165 Image

TPS70351EVM-165

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS70351EVM-165 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS70351
  • Input Voltage: 6 V
  • Output Voltage: 3.3 V
  • Dimensions: 88.6 mm x 74.7 mm
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS70351EVM-165

TPS70351EVM-165 Specifications

TPS70351EVM-165 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 6 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.3 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 88.6 mm x 74.7 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top