| Mfr. #: | TPS65800EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools TPS65800 Eval Mod |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TPS65800EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 5 V Input Voltage Dimensions of 101.6 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65800EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is PMIC Solutions.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 5 V.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 101.6 mm x 76.2 mm.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools