TPS65680EVM

Mfr. #: TPS65680EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools EVM FOR DEVICE TPS65680RSN
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS65680EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65680EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Supply Controllers type. 2.7 V to 5.5 V Input Voltage Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Compatible with Large Format LCD display. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65680EVM Image

TPS65680EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65680EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Power Supply Controllers
  • Tool Is For Evaluation Of: TPS65680
  • Input Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Programmable Level Shifter
  • Series: TPS65680
  • Brand: Texas Instruments
  • For Use With: Large Format LCD display
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65680EVM

TPS65680EVM Specifications

TPS65680EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Power Supply Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed Large Format LCD display

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top