TPS65233EVM

Mfr. #: TPS65233EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS65233 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS65233EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65233EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 4.5 V to 16 V Input Voltage Output Voltage is 13 V/18 V Output current: 350 mA to 1.2 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.121555 oz of Unit Weight

TPS65233EVM Image

TPS65233EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65233EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65233
  • Input Voltage: 4.5 V to 16 V
  • Output Voltage: 13 V/18 V
  • Description/Function: TPS65233 LNB voltage regulator with I2C interface
  • Output Current: 350 mA to 1.2 A
  • Series: TPS65233
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.121555 oz

TPS65233EVM

TPS65233EVM Specifications

TPS65233EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is PMIC Solutions.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4.5 V to 16 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 13 V/18 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 350 mA to 1.2 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.121555 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top