TPS62743EVM-689

Mfr. #: TPS62743EVM-689
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS62743EVM-689
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS62743EVM-689 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62743EVM-689 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2 V to 5.5 V Input Voltage Output Voltage is 1.2 V to 3.3 V Output current: 300 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62743EVM-689 Image

TPS62743EVM-689

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62743EVM-689 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62743
  • Input Voltage: 2 V to 5.5 V
  • Output Voltage: 1.2 V to 3.3 V
  • Description/Function: Evaluation module for the TPS62473 synchronous, step-down converter
  • Output Current: 300 mA
  • Series: TPS62743
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62743EVM-689

TPS62743EVM-689 Specifications

TPS62743EVM-689 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2 V to 5.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V to 3.3 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 300 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top