TPS62700EVM-264

Mfr. #: TPS62700EVM-264
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS62700EVM-264
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS62700EVM-264 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62700EVM-264 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 2.5 V to 6 V Input Voltage Output Voltage is 1.3 V to 3 V Dimensions of 25.4 mm x 25.4 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62700EVM-264 Image

TPS62700EVM-264

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62700EVM-264 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62700
  • Input Voltage: 2.5 V to 6 V
  • Output Voltage: 1.3 V to 3 V
  • Dimensions: 25.4 mm x 25.4 mm
  • Series: TPS62700
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62700EVM-264

TPS62700EVM-264 Specifications

TPS62700EVM-264 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.5 V to 6 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.3 V to 3 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 25.4 mm x 25.4 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top