TPS62693EVM-076

Mfr. #: TPS62693EVM-076
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS62693EVM-076
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS62693EVM-076 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62693EVM-076 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.039998 oz of Unit Weight

TPS62693EVM-076 Image

TPS62693EVM-076

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62693EVM-076 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Series: TPS62693
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.039998 oz

TPS62693EVM-076

TPS62693EVM-076 Specifications

TPS62693EVM-076 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.039998 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top