TPS62615EVM-419

Mfr. #: TPS62615EVM-419
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS62615 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS62615EVM-419 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62615EVM-419 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.3 V to 5.5 V Input Voltage Output Voltage is 1.2 V Output current: 350 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62615EVM-419 Image

TPS62615EVM-419

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62615EVM-419 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62615
  • Input Voltage: 2.3 V to 5.5 V
  • Output Voltage: 1.2 V
  • Description/Function: TPS626xxEVM-419 is a fully assembled and tested platform for evaluating the performance of the TPS6261x/2x/6x high-frequency, synchronous, step-down dc-dc converters optimized for battery-powered portable applications
  • Output Current: 350 mA
  • Series: TPS62615
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62615EVM-419

TPS62615EVM-419 Specifications

TPS62615EVM-419 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.3 V to 5.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 350 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top